Chem-Rock MV

Available Sizes
  • 1.5 Gallon BAG-PAKTM Unit in a single pail
  • 3 Gallon BAG-PAKTM Unit in a single pail
  • 15 Gallon Unit in three 5 gallon pails
  • 165 Gallon Bulk Unit in three 55 gallon drums
Advantages
  • 100% solids
  • Faster cure available using CHEM-ROCK ACCELERATOR
  • Excellent inter-coat adhesion to ROCK-TRED primers and finish coats
  • Flowable, easy to apply formulation
  • Odorless / VOC compliant
  • Water-clear, high gloss finish
  • Easy mix ratio
  • Good UV and chemical resistance

Description

CHEM-ROCK MV is a water clear, 100% solids, medium viscosity, cyclo-aliphatic, 2 part epoxy paint coating. CHEM-ROCK MV is a multi-use coating designed to provide very good abrasion and chemical resistance, UV protection, gloss retention, durability and workability for the applicator.

 

Uses

CHEM-ROCK MV is used where a water clear or solid color high build "neat" coating is required or as an easy working, self-leveling body or finish coat in broadcast or trowel applied industrial and decorative flooring systems. Its medium viscosity characteristic makes it an ideal "seed" coating to broadcast flakes or aggregate into. CHEM-ROCK MV is VOC compliant and meets all USDA/FDA guidelines for use in federally inspected facilities.

 

Typical Coverage

CHEM-ROCK MV is typically applied between 60-150 square feet per gallon per coat depending upon substrate and project requirements.

 

Physical Properties

Volume mix ratio 2 to 1 (Resin to Hardener)
Viscosity (mixed) 900-1000 CPS Typical
Solids Content (%) 100 % (ASTM D-2697)
Hardness (ASTM D-2240) 75-85 (Shore D)
VOC Compliant with all US Regulations
Application Temps. 60° – 85° F
Gel Time 40-50 minutes @ 75° F
Dry to Touch (recoat withcompatible products) 3 - 4 hours @ 75° F
Through Cure 8 - 10 hours @ 75° F
Open for light traffic 24 hours @ 75° F
Shelf Life 1 Year in unopened units
 

Limitations & For Best Results

  • Do not thin this product.
  • Do not apply when Humidity exceeds 70% indoors.
  • When re-coating, always apply the next coat within 24 hours of completing the previous coat.
  • Do not allow to puddle during application.
  • Allow each coat to dry to 'tack-free' or clearprior to re-coat.
  • When pigmenting this product using lighter colors application at 15 mils or in multiple coats may be required for full hide.
 

Product Application

Apply using brush, roller and squeegee ROCKTRED product test data is based on environmental temperatures of 75° F (24° C). Viscosity and working time are always affected by temperatures above or below that mark. When applying product always consider the ambient, surface, and product temperature at the time and place of installation.

 

Color and Textures

CHEM-ROCK MV is manufactured in WATER CLEAR and can be field pigmented using ROCK-TRED colorants. Most ROCK-TRED products are available in a wide range of textures using an appropriate aggregate.

 

Chemical Resistance

Always refer to ROCK-TRED's chemical resistance chart for specific information on each product / system or contact ROCK-TRED directly.

 

Product Storage

DO NOT allow ROCK-TRED products to freeze. All ROCK-TRED products should be properly stored above the floor on pallets or shelves, and in an area that has a constant minimum temperature of 50°F.

 

Surface Preparation

Always apply ROCK-TRED products to a clean / sound substrate that is free of laitance, grease, oils, debris, and curing compounds. Concrete substrates should be cured for a minimum of 28 days prior to application of product [except as otherwise noted on the individual Product Data Sheet]. Whenever possible, remove existing coatings and/or flooring systems completely; if complete removal is not possible always perform tests to determine adhesion and compatibility to the existing flooring. Mechanical preparation by means of a shotblasting or diamond grinding machine to a minimum CSP-2 profile followed by application of an appropriate ROCK-TRED primer or base system is the best and recommended installation method for CHEM-ROCK MV applications. If the substrate is not properly prepared and the appropriate profile is not achieved, failure of the product to adhere to the substrate may occur.

 

Clean Up

Application tools and equipment can be cleaned with soap and water immediately after use, or with solvent once the product has begun to cure.

 

Disposal

Product containers will contain product residue and must be disposed of properly. Label warnings must be observed at all times. All containers must be disposed in accordance with federal, state, and local regulations.

 

Important Notice

Always read and acquaint yourself with ROCK-TRED's Product Data Sheet, SDS [safety data sheet], and product labels for each individual product prior to mixing and prior to use. For further assistance, product questions, additional information and/or unexpected or unusual installation conditions – contact your Area Sales Representative or ROCK-TRED directly for recommendations. Kit components are pre-measured for optimal performance. Catalyzation errors due to incorrect mixing in the field voids product warranty.