Latest Blogs


  • Dear Valued Customer:
    I am pleased to announce that ICP Construction, Inc. (ICP), a division of the ICP Group, has finalized the acquisition of Rock-Tred.

    The ICP Group is an Industry Leader in the Coatings, Adhesives and Sealants markets. More information on ICP can be found at www.icpgroup.com. We have business platforms in the Industrial, Adhesives and Sealants, and Construction markets.

    ICP will be positioning Rock-Tred’s products and services within the ICP Construction Performance Coatings Group brand line-up, which currently includes the Fiberlock, DryTreat and California Sport Surfaces businesses. We plan to build and expand the Rock-Tred business lines and production capabilities which will lead to numerous growth and expansion opportunities.

    Christopher O’Brien, the former owner of Rock-Tred, will be ICP Construction’s new VP of Flooring Systems. He will work with me to strategically expand this product range organically and through acquisitions.

  • Andover, Mass.—January 16, 2017 — Innovative Chemical Products (the ICP Group) has announced the acquisition of Rock-Tred Corporation, a leading manufacturer of polymer floor coating solutions that repair, maintain, protect and beautify floors. Rock-Tred will be integrated into ICP Construction, Inc., one of the three divisions of the ICP Group.

    ICP Construction has two primary product groups: architectural paint and coatings, and performance coatings. Rock-Tred will be positioned into the performance coatings group, joining established brands such as Fiberlock, Dry-Treat, and California Sports Surfaces.

  • monthly-news
  • Image

    monthly-news
  • The two most critical components of any successful coatings project are the surface preparation and selecting the right top coat. Like building a house a solid foundation (good surface prep) and a quality roof to prevent leaking and damage (selecting the right top coat) will ensure success for years to come.
     
    The two most critical components of any successful coatings project are the surface preparation and selecting the right top coat. Like building a house a solid foundation (good surface prep) and a quality roof to prevent leaking and damage (selecting the right top coat) will ensure success for years to come.
     
    Not with ROCK-TRED! We offer twelve (12) different top coats for your customer’s needs. Whether it is harsh chemical attack, heavy potential for abrasion/scratch resistance, high-intensity Ultra Violet (U.V.) exposure or just normal foot traffic, we have the right top coat solution for you!
     

  • Rock-Tred has two products that are designed to be very easy to use, cure quickly and exhibit amazing bond strength to the repaired area.

    RQP - Rock Quick Patch

    RQP-Rock Quick Patch is a 100% solids, non-shrinking repair paste. This product can be applied using a 300 ml x 300 ml caulk gun in the RQP-TS tube set, or can be used by applying with a taping knife from the 32 ounce or 2 gallon kit set.

    Some Product Highlights to Note:

    • Non-Shrinking formula, so . This is great for “sinkers” that occur when using traditional 100% solids epoxy.
    • Can be feathered to zero, so no additional grinding is required.
    • 15 minutes of working time, and will usually be fully cured within 45-60 minutes.
    • Has a very high “hardness” rating (Shore D-85).
    • View Rock-Tred Quick Patch Tech Data Here

    ROCK-MENDER

    Rock-Mender is a 100% solids “ultra-fast” curing polyurea. Like the RQP featured above, this product is easily placed using a 300 ml x 300 ml dual component caulk gun or can be conventionally mixed and placed out of our 2 or 10 gallon sets.

  • It will not be long now before the leaves turn and frost appears on the pumpkins. Taking a moment to review three common practices can help ensure your projects remain trouble free.

    1. Conditioning Project Materials - One of the most common mistakes made by contractors is NOT conditioning the project materials. Cold material and warm slab temperatures and vice versa can create problems. Whenever possible, store the materials at the project site for at least 24 hours prior to applying. Exceptions to this rule are when the jobsite is near or below freezing and when using ROCK-CRETE products on jobsites below 50°F. Refer to the Technical Data Sheets for more info on these situations.

  •  
     
  • 2008 seems like a lifetime ago for me. It was in that year that I took control of Rock Tred. It was a company that had been around for a very long time but also a company that had lost its way. It was losing money each year and had no vision for its future. The employees were defeated, and there was no unity in the ranks. This lead to a lack of responsibility and lots of finger pointing.

    monthly-news
  • For nearly six years Rock-Tred’s’ Ultra U.V. epoxy top coat has continued to out prove ALL competitors epoxy top coat against Ultra Violet attack. This revolutionary patented formula exhibits UN matched performance, only our line of polyaspartics test better.Ultra U.V. is contractor friendly (built by contractors for contractors) and has a nice “working time” and allows smaller crews to complete projects.

  • It was a company that had been around for a very long time but also a company that had lost its way. It was losing money each year and had no vision for its future. The employees were defeated and there was no unity in the ranks. This lead to a lack of responsibility and lots of finger pointing. In the first 3 months of taking over the business it became crystal clear to me that I would need to replace almost every employee.

  • Last month we discussed in our first part of Project Planning 101, what type of information should be included in a project file.Now we are going to talk about keeping track of equipment, small tools and disposables that go out on a project.A large number of contractors DO NOT do a very good job of tracking these items. As contractors get busier it’s very easy to miss the small details

    articles
  • The Occupational Safety and Health Administration (OSHA) has issued a final rule to curb lung cancer, silicosis, chronic obstructive pulmonary disease and kidney disease in America's workers by limiting their exposure to respirable crystalline silica. The rule is comprised of two standards, one for Construction and one for General Industry and MaritimeOSHA estimates that the rule will save over 600 lives and prevent more than 900 new cases of silicosis each year, once its effects are fully realized..

  • Rock-Tred's Fast Floor EP, ONE DAY HIGH SOLIDS Floor System Will Make You More Money! The system comprises of a pigmented coat of Chem-Rock-LT-45, 100% solids epoxy. This product will cure very quickly (usually a few hours) with substrate and air temperatures above 65 degrees Fahrenheit.Last month we discussed our first part of Project Planning 101, information to include in a project file, view here.

  • Now that warm weather is here, discover how Chem-Thane P-50 from Rock-Tred will help you win more jobs and make more money. CHEM-THANE P50 is a water clear, 2-component, 85% solids modified aliphatic/polyaspartic floor coating that combines the best attributes of high grade epoxy and urethane products.

  • Keeping good records has always been and always be a good business practice. As time passes our recollection of project specifics can fade, and should a problem or concern arise with one of your customers, having the ability to just grab the project file is a great help.Remember “people don’t plan to fail….they fail to plan”. Good record keeping starting with a customer job file is a good start.

  • Come join us for the Rock-Tred Institute April 19th & 20th! Spaces are limited so contact us to save a seat today! Take a look at this video and see what all the excitment is about!

  • In the first two parts of this three part essay, we covered the necessary items to keep a functional and useful job file. This becomes even more important should a future issue develop with a project. The second part was how to track your equipment, small tools and typical throw away items like brushes, roller covers and mix buckets, an area that many newer contractors fail to do.

  • Keeping good records has always been and always be a good business practice. As time passes our recollection of project specifics can fade, and should a problem or concern arise with one of your customers, having the ability to just grab the project file is a great help.Remember “people don’t plan to fail….they fail to plan”. Good record keeping starting with a customer job file is a good start.

  • Concrete is essentially a hard sponge. Like a sponge, it readily absorbs water from any available source unless it can be sealed on all sides. Most new slab-on-grade (or ground) construction incorporates a vapor barrier on the positive side of the concrete slab (the bottom side of the concrete). This vapor barrier is designed to prevent moisture from entering the slab from the ground.

  • “First we kill All the Lawyers”-William Shakespeare may have been on to something, but 2 of my best friends and my favorite cousin may not be too happy.Installing floor and wall coatings today has become increasingly more difficult for several reasons: more competition (some goo, most not so much), higher pricing from suppliers, more demands from these same suppliers to settle your account quicker, less quality labor to draw from and the list goes on and on.

  • "Best training class I have been to ever, very informative and will help me grow!"-Chicago, IL"I've been doing this for 12 years, and wish I would of taken these back at the beginning. So much information"-Wisconsin."Should be a requirement of every contractor installing floor and wall coatings and systems"-Alabama.I signed up as a painter who could do floors, now I'm a floor professional who can also paint!!-Pittsburgh, PA

  • Rock-Tred’s new generation Chem-Rock Ultra U.V., ultra-violet resistant epoxy continues to outperform all the competition.

  • Being a contractor today comes with more risk than ever before. As I try and keep up on my industry reading I’m amazed at the nature of some of the lawsuits, but also how many could have been prevented with a little bit of planning.One of the key things that can protect a contractor is a well thought out and written warranty.Most construction related problems that cannot be resolved typically will end up in arbitration or mediation as opposed to actually going in front of a judge.

  • While most of the space here in ROCK-TRED News is usually dedicated to our newest or top selling products and systems, this month we want to talk about some specialty products that can help you in difficult situations.ROCK-TRED has been solving problems for contractors since 1939! Let our experienced TEAM help you with ALL of your coating projects and challenges.

  • The rebound hammer method, also commonly referred to the Schmidt Hammer is a test to check the impact strength of a concrete substrate. This hammer has a piston that is engaged easily by the user, then when pushed on to the concrete fires. The scale on the hammer then produces a reading in PSI (pounds per square inch) of the tested area. Low readings could signify faulty strength concrete or hollow spots. These need to be addressed prior to doing any surface prep.

  • As we enter a New Year with new opportunities let us start with the basics of ROCK-TRED products and discuss our family of cleaners only available through ROCK-TRED.75% of all coatings projects will fail due to insufficient bond profile. Before we can even think about turning on today’s high-tech and expensive surface prep equipment it is a good practice to make sure the surface is clean.

  • Falls in the workplace are the leading cause of injury producing accidents in the U.S, according to the National Floor Safety Institute (NFSI). How can end users, architects, specifers and flooring installers adequately know what is “too slippery”? While this topic is very scientific and very detailed, I will try and summarize for this article. “The ratio of the force that maintains contact between an object and a surface and the frictional force that resists the motion of the object” .

  • As we all begin a New Year with new challenges it is quite common for contractors to try and utilize “left over” products on the shelves to get the early year projects completed without purchasing materials.This makes good economic sense if you have the correct components of the system you need.What makes poor economic sense is trying to mix and match various suppliers’ products to install “epoxy goulash”. Not all epoxy coating products are compatible.

    articles
  • Applying low permeable floor finishes over concrete can be a treacherous task if one is unaware of the many pit falls that await the inexperienced flooring contractor or do it yourselfer. Each year millions of dollars are lost due to floor finish failures. Failure in low permeability flooring finishes often occurs where there are high moisture levels in the concrete. This high moisture content along with the alkalinity naturally present in concrete can eventually create an aggressive concentrate that migrates to the bond line of the floor finish.

  • RQP-Rock Quick Patch is a 100% solids, non-shrinking repair paste. This product can be applied using a 300 ml x 300 ml caulk gun in the RQP-TS tube set, or can be used by applying with a taping knife from the 32 ounce or 2 gallon kit set.Rock-Tred has two products that are designed to be very easy to use, cure very quickly and exhibit amazing bond strength to the repaired area.

  • Rock-Tred Announces a Brand New Flake Family of Colors: Terrazzo Blend! Contractors and customers are always looking for flooring colors that will distinguish their project from others. With Rock-Tred's new Terrazzo Blend Flake, contractors and customers can now choose from nine (9) different colors to provide a typical high-end terrazzo look for much less.This unique blend of decorative flake is ONLY AVAILABLE THROUGH ROCK-TRED!

  • Rock-Crete TR — This is a trowel version that is designed for projects requiring ¼” thickness or greater. With the changes made in 2014 to our formulation the Rock-Crete TR is more resin rich and a contractor can complete the entire installation standing up. Application is made with a cam rake and loop roller — hand troweling is not required unless additional quartz is field added to create a stiffer mix only as needed.

  • Conditioning Project Materials-One of the most common mistakes made by contractors is NOT conditioning the project materials. Cold material and warm slab temperatures and vice versa can create problems. Whenever possible, store the materials at the project site for at least 24 hours prior to applying. Exceptions to this rule are when the jobsite is near or below freezing and when using ROCK-CRETE products on jobsites below 50°F. Refer to the Technical Data Sheets for more info on these situations.

  • The CHEM-ROCK SAFETY-TRED System is a new product offering from ROCK-TRED that provides an anti-slip solution for industrial contractors and plant/facilities maintenance personnel. The material composition and extended working time make installations easy and the results predictable. Call your ROCK-TRED Rep or our Sales Office today so CHEM-ROCK SAFETY-TRED can help you stop slip and falls!

  • Urethane mortor systems such as Rock-Crete are one of the fastest growing segments in the industrial flooring market today. While the concept of cementitious urethane based systems has been around longer than cellular telephones, they continue to evolve to become more applicator friendly.Concrete Cracks! We all know that but do we understand why and do we know how to make the best out of a less than perfect material?

  • A high wear, anti-slip coating system.The CHEM-ROCK SAFETY-TRED System is a new product offering from ROCK-TRED that provides an anti-slip solution for industrial contractors and plant/facilities maintenance personnel.ock-Tred is hosting our last Rock-Tred Institute for 2015! Don't miss out on your last chance to take part in our revolutionary classes!.s the leaves turn and frost appears on the pumpkin we all need to be aware of some common practices to help insure your projects are trouble free.

  • Mold and mildew have become a huge concern in construction and maintenance of buildings of all types, including correctional facilities. A mold problem can add costs and delays to a construction project and plague facility and maintenance personnel with an unending maintenance cycle. Mold thrives in warm, damp, poorly ventilated environments such as a shower area in a bathroom.

  • Concrete is by far the most common structural substrate on which resinous flooring materials are applied. Concrete, in its most basic description, is a mixture of cement, various grades and sizes of aggregate and water. While the makeup of concrete is basic in design, the proper placement, curing and drying of concrete is an extremely complex process requiring a high degree of expertise.

  • Rock-Tred will be exhibiting at the Concrete Decor Show in Indianapolis and were offering our customers free passes! To receive your free passes simply click on the link and enter the promo code RockTredVIP2015.Use the code RQP2015 on your next order to receive 10% off RQP refill tubes. Offer ends 10/31/15.

  • The seamless system consists of multiple products all built around 100-percent solids epoxy resin. The components must be installed within a 24-hour recoat window in order to achieve a chemical linkage. Typically, after 24 hours, the linkage is no longer available and only a mechanical bond can be achieved. The product components include a waterproof membrane, wall and ceiling materials and cove and flooring resins.

  • The industrial flooring industry, as a whole, has typically taken the costs and responsibility for these crack repairs on the chin, without questioning who is really to blame for the deficiency. The rule governing this behavior is the “who touched it last” rule, which means – ‘if you coated it, you accepted it!’.Rock-Tred will be exhibiting at the Concrete Decor Show in Indianapolis and were offering our customers free passes! Come see us there!

  • Rock Tred SL is an easily applied 100% solids epoxy /aggregate blend that will produce superior strength and wear capabilities. Rock-Tred SL is ideal for areas of high traffic, floors that are worn out, or floors that need a quick return to service solution with high aesthetics.Testing the PH level is a quick, easy and inexpensive test that yields good information on the concrete slab’s surface and can save a contractor from potential issues and job failures.

  • Falls in the workplace are the leading cause of injury producing accidents in the U.S, according to the National Floor Safety Institute (NFSI). How can end users, architects, specifers and flooring installers adequately know what is “too slippery”?

  • Rock-Tred is proud to announce our affiliation with two new independent Rep agency’s to promote our product line.DON JOHNSON - SALES RESOURCES: Sales Resources based in Marietta, GA is responsible for the entire State of Georgia. Their principal is Don Johnston. They join TEAM Rock-Tred with over 30 years experience in construction based building materials, including industrial coatings.

  • ROCK-TRED is pleased to announce the newest addition to our high solids, low odor polyaspartic family CHEM-THANE P-50! P-50 offers many of the same benefits found in our P-100 and P-200 polyaspartic coatings such as quick return to service and high UV resistance, but provides the extended working time needed on warmer and more humid jobsites.Our Rock-Tred Institute classes continue to have fantastic reviews from attending coating contractors. Check out what they had to say about our last two classes!

  • NEW PRODUCT RELEASE! ROCK-BLOCK 3K - Single Coat Moisture Vapor Barrier!: Stop moisture vapor transmission through a concrete slab IN ONE COAT with Rock-Tred’s new ROCK-BLOCK 3K Moisture Barrier formulation. ROCK-BLOCK 3K has been engineered to provide the same high level of moisture vapor suppression performance as our original ROCK-BLOCK, but now can be applied in a single 16 mil coat! Our ROCK-BLOCK Five Year Warrantee is available for ROCK-BLOCK 3K too.

  • ROCK-TRED customers can recieve a free one year subscription to Concrete Decor Magazine!. Don't wait to register! Our next ROCK-TRED Institute is on February, 17th, 18th and 19th of 2015. There are still a few seats available! Please contact Erik Sebby at esebby@rocktred.com if you are interested or need additional information: Want more details? Why not contact a ROCK-TRED representative?

  • Everybody knows that you can’t install decorative quartz and flake systems on low temp job sites, right? The material wont set up, the clear finish coat will yellow, the system will not be as strong….we have all heard this before. Time to rethink! ROCK-TRED has been manufacturing low temperature polymer solutions for decades and our current lineup of low temperature products is better than ever.

  • ROCK-TRED is pleased to introduce our new waterborne, deep penetrating epoxy primer ROCK-PRIME DP. ROCK-PRIME DP is a low viscosity, clear, primer with excellent adhesion and fast cure time. It is designed to penetrate into a prepared concrete slab and cure without leaving a heavy film build on top of the surface. ROCK-PRIME DP is able to be field pigmented using our Universal Colorants, but only requires a 1.5 Jar per 2.5 gallon mix..

  • Chem-Rock LT-45 – This “low-temperature”, 100% solids epoxy is designed to cure where both substrate and ambient air temperatures are as low as 45 degrees Fahrenheit. Please keep in mind when using this product on days where the temperature is above 60 degrees Fahrenheit the working time is significantly reduced. (although we have had customers use it all summer long for quick patches or 1 day floors).

  • Rock-Tred announces release of new product! As the market demands more “Eco” friendly products, we are pleased to announce the release of Rock-Prime-HB. Rock Tred SL is an easily applied 100% solids epoxy /aggregate blend that will produce superior strength and wear capabilities. Rock-Tred SL is ideal for areas of high traffic, floors that are worn out, or floors that need a quick return to service solution with high aesthetics.